Cable for a building
Answer a few questions about the building, its rooms and appliances — the site picks the cable mark and cross-section for every circuit, the breaker rating and the length, builds a specification in the factory’s sizes and passes it to a price request or Excel.
Ready templates
Typical buildings with rooms and appliances filled in — change any value.
One phase, electric cooker, air conditioner.
One phase, electric cooker, kitchen and two rooms.
Three phases, air conditioners, electric cooker.
Three phases, overhead supply (СИП), boiler room, pump, garage, yard.
Three phases, open spaces, server room, kitchen.
Three phases, underground supply, machine tool, welding, compressor.
The calculation is an estimate. Circuit sizes follow PUE table 1.3.6 (copper cable in air, × 0.92 for three phases) and the voltage drop, but never go below the minimum of СП 256.1325800 (lighting 1.5 mm², sockets 2.5 mm², a one-phase cooker 6 mm²); conductors in dwellings are copper (PUE 7.1.34). The breaker comes from the standard row: load current ≤ rating ≤ allowed current of the cable (PUE 3.1.9–3.1.11). The supply line is sized for the larger of the allocated and the design power, СИП-2 by its own current table. The design power is the sum of the circuits’ powers with demand factors. The final choice is the designer’s; the factory’s manager checks the specification on request.
Leave a request
We reply on working days from 9:00 to 18:00. A plant specialist will contact you directly.